Verbundvorhaben: OBELIX - Oberflächen unter Feldbedingungen: Analyse der Limitierung für neuartige c-Si Solarzellen, Teilvorhabentitel: Defektkinetik und- reaktionen an der Grenzfläche zwischen Dielektrika und Silizium
|
Project leader |
01.03.2024 – 28.02.2027 |
Materialuntersuchungen und Defektreaktionen von Gadotiertem kristallinen Si für IBC Solarzellen POPEI
|
Project leader |
01.05.2021 – 31.10.2023 |
HYDRA Kinetik und Defektreaktionen von Wasserstoff in kristallinem Silizium und funktionalen Schichten
|
Project leader |
01.03.2020 – 30.11.2023 |
ZORRO Teilvorhaben Degradationsuntersuchungen an mono- und multikristallinen PERC-Solarzellen und Lebensdauerproben
|
Project leader |
01.03.2020 – 31.08.2023 |
HEAVENLY subproject: Subproject: High-efficiency solar cell processing for development of simultaneously contacting Ag pastes on multi-functional CVD layers for investigation of long-term stability
|
Project leader |
01.01.2018 – 31.03.2021 |
LIMES subproject: Material-based limitations in crystalline Si and influence of solar cell processing steps
|
Project leader |
01.08.2017 – 30.06.2021 |
Joint research project: Ultra fast regeneration (UFO) Subproject: Acceleration of regeneration kinetics and modelling
|
Project leader |
01.09.2016 – 30.11.2019 |
Joint research project. Subproject: Effect of co-diffusion from doping layers deposited using APCVD on material quality of multicrystalline silicon (MUSKAD)
|
Project leader |
01.05.2016 – 31.10.2019 |
Upgrade technologies for silicon photovoltaics, subproject: B-O regeneration on cell level with modified firing furnace
|
Project leader |
01.01.2016 – 30.06.2019 |
Invest project for updating of process technologies (solar cell research)
|
Project leader |
01.10.2015 – 31.12.2016 |
Development and characterisation of new metal pastes for contacting of p-doped crystalline Si surfaces
|
Project leader |
01.09.2015 – 31.08.2016 |
Joint research project: Solar research cluster: Long-term instabilities of solar cells - Research towards a higher yield (SolarLIFE), subproject: Analysis and strategies of their avoidance
|
Project leader |
01.12.2014 – 30.04.2018 |
Scientific conference siliconPV 2015 - 5th International Conferenz on Crystalline Silicon Photovoltaics
|
Project leader |
01.12.2014 – 31.08.2015 |
Solar cells with passivated rear side emitter using APCVD of doped dielectric layers (PARADIES)
|
Project leader |
01.07.2013 – 30.06.2016 |
High efficiency solar cells from defect reduced n-type mc silicon (CONDOR)
|
Project leader |
01.07.2013 – 30.06.2014 |
Material-Characterization and Cell-Process-Development for Solarforce RST Silicon Ribbon Material
|
Project leader |
15.03.2013 – 14.09.2014 |
Invest project for updating of process equipment and characterisation technologies of the photovoltaics division of University of Konstanz (IMPACT)
|
Project leader |
01.10.2012 – 31.12.2013 |
Cooperation contract on development of a photoluminescence demonstrator system for characterisation of electronic properties of industrial as-cut silicon wafers
|
Project leader |
04.09.2012 – 01.03.2013 |
REFINE (TP Hahn) Resource friendly paths to conducting films for new applications in systems relevant for energy technology
|
Project leader |
01.09.2012 – 31.08.2016 |
BO correlated degradation and regeneration: fundamental understanding of the influencing factors and determination of the structure (BORNEO)
|
Project leader |
01.04.2012 – 31.03.2015 |
Detailed investigation of contact formation of screen printed metal paste and development of alternative metallisation concepts for crystalline silicon (KONSENS)
|
Project leader |
01.04.2012 – 31.03.2015 |
Cooperation contract on investigation of the PSG in phosphorous diffusion
|
Project leader |
01.12.2011 – 31.03.2013 |
Dow Corning Sheet Project 2011
|
Project leader |
01.06.2011 – 31.05.2016 |
Fabrication and analysis of solar cells from high purity crystalline silicon
|
Project leader |
01.02.2011 – 31.07.2014 |
Methods for wet chemical texturing of monocrystalline silicon wafers for Lotus etching systems
|
Project leader |
16.11.2010 – 31.03.2012 |
Optimisation of Al screen printed rear side emittters and passivation of n-type doped base (ALROUND)
|
Project leader |
01.08.2010 – 31.12.2017 |
Improved industrial processing of multicrystalline Si solar cells using optimised gettering steps (VIP Gettern)
|
Project leader |
01.06.2010 – 30.04.2011 |
Development of advanced rear side structures for solar cells for passivation of industrially processed silicon solar cells using innovative and cost-efficient technologies
|
Project leader |
01.09.2009 – 31.08.2012 |
Schmid Photovoltaic Center of Expertise (SPICE)
|
Project leader |
01.01.2009 – 31.08.2029 |
Transfer selective emitter
|
Project leader |
01.01.2009 – 30.06.2010 |
Cooperation training activities and characterisation in the area of photrovoltaics
|
Project leader |
01.09.2008 – 31.08.2016 |
Optimised processing of RGS-based solar cells (OP-RGS)
|
Project leader |
01.08.2008 – 31.07.2012 |
Invest project for updating of existing and installation of latest process and characterisation technologies in the photovoltaics division of University of Konstanz
|
Project leader |
01.07.2008 – 31.10.2009 |
Development of advanced emitter structures on industrial crystalline silicon solar cells
|
Project leader |
01.05.2008 – 30.04.2011 |
Use of plasma technologies for processing of crystalline silicon solar cells for photovoltaic applications
|
Project leader |
01.04.2008 – 31.03.2011 |
Solar cell processing
|
Project leader |
01.02.2008 – 31.08.2025 |
Plasma-enhanced processes for fabrication of crystalline silicon solar cells
|
Project leader |
01.01.2008 – 31.12.2010 |
CAP 04 Nano-scale precipitates in crystalline silicon for solar cells
|
Project leader |
01.07.2007 – 31.12.2012 |
SolarFocus
|
Project leader |
01.03.2007 – 28.02.2010 |
Kooperationsprojekt 1
|
Project leader |
20.02.2007 – 31.05.2014 |
F+E Degradation
|
Project leader |
01.01.2007 – 31.12.2009 |
Entwicklung innovativer LASER-Technologien innerhalb der Forschungsallianz Kristalline Silizium-Solarzellen-Technologie
|
Project leader |
19.12.2006 – 31.10.2009 |
Passivation of doped Si surfaces for photovoltic applications
|
Project leader |
07.02.2006 – 06.02.2007 |
Cooperation Thermography
|
Project leader |
10.12.2004 – 19.01.2006 |
CRYSTALCLEAR Crystalline Silicon Photovoltaic: Low-cost, highly efficient and reliable modules
|
Project leader |
01.01.2004 – 30.06.2009 |